Officec7, urja bhawan, sector6, panchkula tender documents for arc of preventiveroutinebreakdown maintenance of 220 kv switchyard for 2x300mw, dcrtpp, yamuna nagar chief engineerdcrtpp. Report on industrial summer training on 220 kv substation. Corrigendum title corrigendum description published date document name doc sizein kb 1 corrigendum 6a change in iem. Hot line water washing of 220 kv switch yard equipments and interconnecting transmission lines at visakhapatnam steel plant note. Single line diagram of simulated 500220kv ais substation, cairo 500 substation. Hard wiring of switchyard equipments for status and command contacts to bcpu for 66 kv system while to bcu for 220 kv and 2kv system. Hot line water washing of 220 kv switch yard equipments. The remaining 288 mw is fed to three 160 mva autotransformers working. Turnkey 220 23311kv kv greenfield substation with 8 bays at 220kv, bays at 2kv and 11 bays at 33kv with 2 nos. Lcc panel all other items as per technical specification 1. The requirement was imposed by getco, to maintain stringent accuracy of 0. Iv general technical specification for 220kv sf6 gas insulated metal enclosed switchgear on photo. This contractors environmental management plan cemp has been developed for the rehabilitation of shinuhayr substation located in shinuhayr village of tatev community of syunik marz of ra.
Mediumvoltage shielded power cable 2 kv up to 35 kv. The tstsrots 220 kv line passes through the station site without connecting to the 220 kv buses. Single line diagram of 220233 kv gss khagaul authorized signatory legend 2kv main bus 33kv main bus 2kv transfer bus 33kv transfer bus 3 3 k v n e o r a 3 3 k v k h a g a u lu 1 3 3 k v k h a u lu 2 a b a n d o n e d b a y a i i m s k1 a i m s2 3 3 k k h a g a u l 3 v h a4 3 3 k v b u s c o p l e r 3 3 k v d a n a p ri 1 3 3 k. Fact file power utility lng petronet limited specially. A unit of haryana power generation corporation ltd. Toolssuchaschippinghammer,files,sandpaper,steelwirebrush,windscreen. Nttps is constructed in such a way that every one understand about the construction and working of 220 kv switch yards and its equipments. The incoming voltage level for this substation is 220kv. Project on substation 220kv 2kv transformer lightning free.
Analysis and measurement of electric field exposure inside 500220 kv air insulated substation article pdf available in journal of electrical engineering 122. Abstract the report gives an overview of 220kv power substation. Hpptcl 80 mvar bus reactor at generating station by generator 4. Industrial summer training report on uttar pradesh power corporation limited 220 2 kv substation barahuwa gorakhpur submitted in partial fulfillment of the requirements for the award of degree of bachelor of technology in electrical engineering ee submitted by ashutosh srivastava 75120016 submitted to. Agawam is an existing substation with a 115 kv switchyard. The test voltage of 3 kv rms shall be applied for one minute between the terminals of the secondary windings connected together and earth. Conclusion switchyard is most essential part of the power system. This document coversheet can be embedded as page 1 of the electronic filing or attached as a separate document. Wbseb, bishnupur 220233 kv substation state transmission. The terminal box shall be provided with blank gland. A design layout of 233 kv, 200 mw substation the substation is connected with three substations or load viz. Department of electrical engineering kipmcollege of enggineering and technology plot no. The study of 220kv power substation equipment details eep.
From the 220 kv bus two 220 kv single circuit lines are drawn at 90% loading to supply power to 220kv substations b and c working at a diversity factor of 1. The sf6 gas insulated metal enclosed switchgear shall be totally safe against inadvertent touch of any of its live constituent parts. The two 2 kv feeder bays will accommodate the new medagamatomonaragala. Class of valid upto contact details contact person. Download as pdf, 400200 kv substation 400200 kv substation design scribd 400200 kv substation design free download as pdf file graph of sp. Turnkey 220 23311kv kv greenfield substation with 8 bays at 220kv, bays at 2kv and 11. Section 3 is the simulation of single line diagram of 220 kv substation in etap based upon practical data. Pdf assessment of electric field distribution inside 500220 kv. New 220kv transmission line from puttlam to veyangoda 118km. There are different types of power generating substations like thermal, atomic, and hydroelectric. Procedure for current transformer factory and site.
The highvoltage transmission network of armenia consists of 220 kv and 110 kv power lines with total length of approximately 4,500 km. The grid 220 kv substation, passiana is situated 78 km from bus stand of patiala to samana road. Project on substation 220kv 2kv free download as word doc. Some substations have their switchyard of gas insulated switchgear gis the substations nominal voltage is 220 kv. Three 220 kv double circuit lines working at 80% loading feeds substations d,e,f working at a diversity factor of 1. Pdf power system has dynamic behavior as it faces various disturbances like sudden change in load, sudden change in generation and.
It is a project file on the sarusajai grid 220 kv substation. Design guide for rural substations usda rural development. Pdf the high level electric field intensity produced by high voltage hv. The proposed modifications at this substation, shown on figure 24 below, include constructing a new 345 kv switchyard to interconnect two 345 kv lines, two 345115 kv autotransformers, a new 115 kv circuitbreaker bay, and a. Deen bandhu chhotu ram thermal power station, hpgcl, yamunanagar mobile no. Hot line water washing of 220 kv switch yard equipments and. Bus bar panel, automation drawings220kv busbar panel for gissms. No information embodied in the documents which is not already in the public domain shall be communicated in. Presentation on industrial training in 220kv substation ig nagar, jaipur on the topic operation and maintenance of ehv equipment and trannsmission system. Basic of 400kv substation design scribd basic of 400kv substation design. Removal of 220 kv ocb approx wt 34 mt was challenging. It is the protective part of the whole power system. Diagnostic testing of 220 kv and 33 kv switch yard and 11 kv 6. The remaining 288 mw is fed to three 160 mva autotransformers working at an average 75% loading and 0.
In switchyard we are using hand gloves to open or close isolator and give a earth switch in 66 kv,2 kv and 220 kv but the rating of gloves is maximum 40 kv then why we using that gloves. Officec7,urja bhawan,sector6,panchkula corporate identity number. Cb582 and cb5812 switchgear groups are both connected to the 220 kv bus via a common tee point from dis583 and dis585 refer to. It is all about the components used in an indian 220kv grid transmission substation. Hv substation project brief history et bihl d i 1987 f th il ti f l hv mv d established in 1987 for the realization of complex hv, mv and lv projects. Pdf analysis and measurement of electric field exposure. The hwps 220kv switchyard provides the switching for the eight generators and thirteen 220 kv lines that includes four lines to. Wbseb, bishnupur 220233 kv substation substation for transmitting power up to 180 mw. The sce owned portion of the 220 kv switchrack is scheduled to be separated from the jointly owned 230 kv switchyard in. Switchyard equipments, switchyard in hindi, switchyard single line diagram, switchyard construction, switchyard protection, switchyard maintenance, switchyard animation, switchyard in. Apr 06, 2011 in switchyard we are using hand gloves to open or close isolator and give a earth switch in 66 kv,2 kv and 220 kv but the rating of gloves is maximum 40 kv then why we using that gloves. The following current and former members of the substation subcommittee of the nreca. Aug 09, 2015 switchyard consists of four 400 kv busbars fed by 7 nos. The 315 mva transformers step down the voltage from 400 kv to 220 kv.
All associated works with the design, construction and commissioning will form part of this turnkey epc project. This project overall view of 220kv switch yard in dr. Procedure for current transformer factory and site acceptance tests hv tester. By this agreement the parties desire to provide for, i installation of the.
Operational description of 400kv switchyard ntpc ramagundam rstps. Two single switched 220 kv lines from cbts four 150 mva 220 66 kv connection transformers with two transformers connected direct to the 220 kv bus bars and the other two transformers switched in a breakerandhalf switch bay the 66 kv switchyard includes four 66 kv bus bars, eleven feeders, four busties and four 50 mvar capacitor banks. Saurya urja company of rajasthan limited bhadla 500 mw 500 500 0 0 0 jun18 aug18 saurya urja generation switchyard bhadla pooling station 220 kv. The ground conditions of the proposed new site have been verified as satisfactory by geological investigation. Pgcil 765400 kv ss at chilakaluripeta 1,505 pgcil 4002202 kv substation at latehar 1,295 saurya urja 220 kv bhadlajodhpur switchyard for solar 530 solaire direct bhadla, 2x70 mw acbos 300 alstom bharat forgeghatampurnlctransformers package 1,015 wbsetcl rejinagar substation 410 hpptcl gumma bay extension substation with transformer 375. What is a substation definition, types of substations at present, the demand for electrical power is growing rapidly, and this can be fulfilled by the power generating substations. The test shall be conducted in accordance with is part 1. The substation of 220kv66kv 11kv has fifteen outgoing feeders, namely. Electrical clearance in substation electrical notes. Pdf transient analysis of 220kv distribution substation.
Figure 1 existing substation with 220 kv breaker and a half and 110 kv. Energy meters with mod bus protocol shall be connected to fo network by using appropriate converter so as metering data shall be available to the. Section 4 is the load flow analysis of the substation. Tenderer has to fill the data wherever and whatever required in the tender schedule without fail and sign all the pages tender no. Project name nurek 500 kv switchyard reconstruction project sector and subsector. Hwps is the key 220 kv connection station for most of the power stations in the latrobe valley, including eight gdf suez hazelwood generators with a combined output of approximately 1600 mw. The nurek 500 kv switchyard reconstruction project was. Apr, 2017 report on industrial summer training on 220 kv substation 1. It includes a 220 kv switchyard with two incoming 220 kv lines from thomastown terminal station tts and rowville terminal station rots, two 220 kv busbars, a 200 mvar capacitor bank and thirteen 220 kv circuit breakers.
1286 1318 1312 1507 558 163 1068 1297 1029 7 1418 232 1562 766 1219 140 1491 739 1527 897 303 81 20 921 81 546 1260 772 1075 1039 1033 196 859 347 698 648 1160 648 355 526 270 644 219 1183 674